Setting up the greenhouse at Levi’s Nek farm – Lesotho



Following the successful construction of a 300 m² greenhouse at the Saint-Paul School for the Deaf and Hard of Hearing in Leribe, the young residents of Levi’s Nek have embarked on the construction of two other structures, each measuring 200 m². These greenhouses will provide a protected space for growing vegetables and producing seedlings for the farm, including a nursery supplying vegetable seedlings. All the work was carried out by the farm’s deaf residents in their equipped workshop. In the first stage, the young residents set the poles in cement.


Leave a Reply