The Gouloumbou greenhouse, was ordered from a designer based in Dakar, was transported to the site and assembled by 3 technicians and assisted by the entire farm staff.
The assembly was done in several steps and by several teams:
– delivery of the structures,
– the installation of the footings for a solid support of the greenhouse, because during the rainy season, violent winds are frequent causing a lot of damage on the houses and the agricultural installations.
– the installation of the greenhouse with textile separations installed inside to be able to cultivate several varieties of the same species.
Leave a Reply
You must be logged in to post a comment.